Not the optimum tool, but a long 36mm socket worked here.
Seals installed:
Camshafts ok, checking that they rotate smoothly:
Grabbed the exhaust manifold and the turbo to see how they line up:
And then the downpipe. I didnt find the downpipe v-band at this point and I had to juggle with the camera at the same time:
Leave a Reply